Thermbond Formula 403G and Formula 18G was installed in a boiler that had to be back in service in two days…

Customer in Hydrocarbon Processing Industry

Thermbond Formula 403G and Formula 18G was installed in a boiler that had to be back in service in two days. The call went out to Stellar on the weekend and the material was delivered on time. Because of eliminating dry out we finished the job on time. We will look for other areas to use Thermbond.